Overall project manager and management of a team in the following areas: development, quality, plastics production, automation, purchasing, sampling, logistics
Development projects across the entire product development process through to the implementation of the
Realization of line automation for the production of products with GMP elements
Automation project manager: planning of the entire automation lines for the production of new plastic products (ISO8 clean room) incl. 4 - 8 synchronized injection moulding machines
Design of the products and graphic creation of the colored product graphics
Automated changeover of various product derivatives within the lines
Partial and full CE certification of the automation lines in various projects
Relocation of eight fully automated production lines including step-by-step commissioning
Conception and procurement of various injection molding machines and integration into the overall automation including negotiation of alignment, coordination of cycle times, qualification, etc.
Coordination of the development of injection molds (multiple cavities and various plastics) and - plastics) and integration into the overall project planning
Managing the relocation of five additional fully automated production lines including various clean room conversions and coordinating twelve suppliers involved in the relocation
Conversion of existing automation lines into new projects, including qualification of the systems and installed measuring equipment, management of commissioning, product validation processes and line validations (IQ, OQ and PQ)
Coordination of the development of automated packaging stations integrated into the lines
Implementation of a functioning product traceability process with UV-based QR codes for automatically assembled product lines (Industry 4.0)
International supplier management / coordination as OEM
Cooperation with suppliers to develop automated test cell for leakage measurements of products and integration into existing line
Project roadmaps, product responsibility, budget responsibility, scheduling, run-in and run-out
and phase-out controls in current series, reporting to management
Specifications, LOPs, REKOs, RfQs, FMEAs, tracking of test laboratories